Risk Assessments and Method Statements

Risk Assessments and Method Statements

Every company needs to undertake “Suitable and Sufficient assessments of the risks their employees and others may be exposed to”. Many companies find completing these Risk Assessments and Method Statements (RAMS) can be a daunting prospect, due to: -

  • Complexity
  • Fear of missing something
  • Time constraints and time to complete
  • Belief they will stop you completing the task

These are just some of the reasons used by companies to overlook the need to complete & provide these vital documents. Without these the impact of an incident on a company can be catastrophic, especially as the sanctions are based on company turnover. With no supporting documentation how do you prove that all necessary control measures have been implemented?

Our Risk Assessments and Method Statements (RAMS) writing service can provide you with suitable and sufficient RAMS to help stay on the right side of enforcing authorities.

Risk Assessment

The systematic evaluation of hazards and the severity of any resultant harm or damage should the hazard be realised. i.e. What can go wrong; How much will it hurt; What can we do about it. Only when this has been done can control measures be implemented in order to minimise the outcome should something still go wrong.

Method Statements

A set of comprehensive instructions on how to complete a task used in conjunction with a risk assessment in order to minimise the risk of harm to employees and others affected by the undertaking. Without a Method Statement any task can turn into an disorganised and potentially dangerous undertaking.

Want to complete your own Risk Assessments & Method Statements?

Then our Risk Assessment & Method Statement training course is exactly what you need. From as little as £27.00 +vat per person you will be able complete your own and reduce the ongoing costs of using external help.

No items found.
Notice Boards Supply & Installation

Notice boards supply & Installation

Safety information needs to be clearly displayed and a notice board within the entrance of the property can help. A notice board can help you organise and display the relevant information. Whether you need a plain board or a lockable type we supply and install for you.

From £65.00 +vat

Need a Quote? Call Us On 01386 555 739 or Freephone 0800 246 1802.

Fire Safety Document Boxes

Fire Safety Document Boxes supply and installation

Onsite Fire safety documentation a mess? is it scattered or stuck in a cupboard? Then a fire safety document box is the answer to all your woes.

If you don't have space for a document box we can supply Fire Safety Document wallets which take up minimal space and can be hung on the inside of a cupboard door

Document box supply only from £40.00 +Vat

Document Wallet supply only £12.00 +Vat

Need a Quote? Call Us On 01386 555 739 or Freephone 0800 246 1802.

Key Safe Supply & Installation

Key safe supply & Installation

Do you have contractors going to your property and needing keys? The installation of a secure key safe in an out of the way location means your contractors will be able gain entry without having to pick up and drop of keys.

We can supply and install a range of key safes to suit your needs.

Supply & installation from £65.00 +vat

Need a Quote? Call Us On 01386 555 739 or Freephone 0800 246 1802.

What do the signs colours mean?

Safety signs are colour coded in order to make them easier to understand.

Red

Red safety signs (usually a red border) are Prohibition signs stating that something should not be done; for example 'No Smoking' signs etc

Blue

Blue safety signs are Mandatory signs stating what Must be done; for example 'Fire Door' signs

Yellow

Yellow safety signs are Warning signs to provide information on hazards etc that cannot easily be controlled; for example 'Caution Hot Water' signs.

Green

Green safety signs are usually 'Fire safety information; for instance the 'Running Man' signs indicating the fire escape routes.

Do I need Fire Action Notice?

That all depends on the property and how big it is.

Small residential blocks with 2-4 apartments may not benefit form the installation of a Fire Action Notice. But residents should be informed on the actions to take in the event of a fire.

Larger residential blocks, public buildings, commercial premises, factories etc should display appropriate Fire Action Notices in order to provide information to relevant persons in the event of a fire.

Standards

Fire Action Notices should comply with BS 5499-2:1986 Fire safety signs, notices and graphic symbols.

Fast R Solutions always recommend Fire Action Notices use graphical symbols rather than written notices. This helps those who cannot read the text understand what is required

Fire Door Signs

All fire doors should be indicated by signs.

These are usually round and blue in colour. The colour is important as it denotes the instructions are Mandatory

Pedestrian Fire Doors

Pedestrian fire doors (those in corridors etc) must display a 'Fire Door Keep Closed' on both sides of the door. Doors that are held open by automatic holders must display Automatic Fire Door Keep Clear.

Other fire doors

Service risers, plant rooms and cupboards must display Fire Door Keep Locked' on the outside face of doors.

Final exit doors

Final exit fire doors are those that should only be used in the event of an emergency. These must display a 'Fire Exit Keep Clear' on the outside of the door.

Do I Need No Smoking Signs?

The simple answer is Yes

Any enclosed area that is not a domestic premise should display No Smoking signs in accordance with the Smoke Free Regulations 2006

Within blocks of apartments it is recommended that signs state No Smoking in the communal areas this helps prevent confusion for the residents.

Signs Placement

Signs should be placed at all entrances to the buildings; this includes out side the entrances to under-croft car parks. Additional signs should be placed throughout the building if there is a specific need

Safety Audit

Do you already have a safety management system in place, but have a nagging doubt that something has been missed?

Having a second opinion from a Health and Safety professional can help identify weaknesses and omissions in the safety management system.

Risk Assessments

Every company needs to undertake a "Suitable & Sufficient assessment of the risks their employees are exposed to".

Many find that completing Risk Assessments and Method Statements is a daunting undertaking.

Competent Person

Do you need the help of a Health and Safety adviser but don't need a full time person?

Then one of our Competent Person services would be perfect for your needs.

Providing just the right amount of support to help you be Health and Safety compliant.

Policies & Procedures

Well written and appropriate Health and Safety Policies are the backbone of any good safety management system

Getting these wrong can be costly and potentially leave companies or individuals exposed to legal proceedings should something go wrong.

Notice Boards Supply & Installation

Notice boards supply & Installation

Safety information needs to be clearly displayed and a notice board within the entrance of the property can help. A notice board can help you organise and display the relevant information. Whether you need a plain board or a lockable type we supply and install for you.

From £65.00 +vat

Need a Quote? Call Us On 01386 555 739 or Freephone 0800 246 1802.

Fire Safety Document Boxes

Fire Safety Document Boxes supply and installation

Onsite Fire safety documentation a mess? is it scattered or stuck in a cupboard? Then a fire safety document box is the answer to all your woes.

If you don't have space for a document box we can supply Fire Safety Document wallets which take up minimal space and can be hung on the inside of a cupboard door

Document box supply only from £40.00 +Vat

Document Wallet supply only £12.00 +Vat

Need a Quote? Call Us On 01386 555 739 or Freephone 0800 246 1802.

Key Safe Supply & Installation

Key safe supply & Installation

Do you have contractors going to your property and needing keys? The installation of a secure key safe in an out of the way location means your contractors will be able gain entry without having to pick up and drop of keys.

We can supply and install a range of key safes to suit your needs.

Supply & installation from £65.00 +vat

Need a Quote? Call Us On 01386 555 739 or Freephone 0800 246 1802.

Gold Level

As per Bronze level plus the following benefits

  • Monthly visits by a qualified Health & Safety Consultant
  • Annual Health & Safety Management Review
  • Annual Fire Risk Assessment (single site)
  • 2 Half day Training courses for up to 12 people
  • Free Health & Safety Templates
Silver Level

As per Bronze level plus the following benefits

  • Telephone & email support (same day hour response)
  • 2 site visits (half day on site) per year by a qualified Health & Safety Consultant
  • One half day training course for up to 12 people
Bronze Level
  • The right to identify FastR Solutions as the competent person for the company
  • Telephone & email support (24 hour response)
  • Legislative updates & monthly news letters
  • Reduced visit fees should a Health & Safety Consultant need to be on site.
  • Discounted Training
  • Free/Discounted Health & Safety Templates
  • Reduced fees for policies & procedures etc production.
Type 4 Fire Risk Assessment: Common parts and flats (destructive)

A Type 4 fire risk assessment has the same scope of work as a Type 3 fire risk assessment, except that there is a degree of destructive inspection, in both the common parts and the flats, carried out on a sampling basis.

This is the most comprehensive fire risk assessment type, but will only be appropriate in exceptional circumstances – such as when the history of works carried out is unknown and there is reason to suspect serious risk to residents.

A Type 4 Assessment is a major undertaking requiring time and resources to complete. Several trades as well as the fire risk assessor will need to work together. Properties built before the year 2000 will also need a specialist asbestos assessor to be present or on call as these materials may be hidden within the structure.

A building contractor will also be required; both to help gain access to the structure of the property and to make necessary repairs. Although most good fire risk assessment companies will use an endoscope in order to minimise the damage.

Need a Type 4 Assessment? – Contact us to find out how we can help

Type 3 Fire Risk Assessment: Common parts and flats (non-destructive)

A Type 3 fire risk assessment covers what is involved in a Type 1 fire risk assessment and is non-destructive. Going beyond the requirements of the Regulatory Reform (Fire Safety) Order 2005 but not the scope of the Housing Act.

Assessments of this type consider the arrangements for means of escape and fire detection (i.e. smoke alarms) within at least a sample of the flats. Within the flats, the inspection is non-destructive, but the fire resistance of doors to rooms is considered.

Type 3 Fire Risk Assessment may be appropriate for rented flats if there is reason to suspect serious risk to residents in the event of a fire in their flats. (This might be, for example, because of the age of the block or reason for suspicion of widespread, unauthorised material alterations).

Type 3 fire risk assessments are not usually possible in the case of long leasehold flats, unless there is something seriously wrong, as there is normally limited rights of access for freeholders and managing agents.

Need a Type 3 Assessment? – Contact us to find out how we can help

Type 2 Fire Risk Assessment: Common parts only (destructive)

Type 2 fire risk assessments are similar to those of a Type 1 fire risk assessment, except that there is a degree of destructive inspection, carried out on a sampling basis to check the separating construction of the property.

This fire risk assessment type is usually a one-off exercise, which is carried out only if there is good reason to suspect serious structural deficiencies that could lead to spread of fire beyond the point of fire origin.

A Type 2 Fire Risk Assessment is a serious undertaking requiring time and resources to complete. Several trades as well as the fire risk assessor may be needed to work together. Properties built before the year 2000 will also need a specialist asbestos assessor to be present as these materials may be hidden within the structure.

A building contractor will also be required; both to help gain access to the structure of the property and to make necessary repairs. Although most good fire risk assessment companies will use an endoscope in order to minimise the damage.

Need a Type 2 Assessment? – Contact us to find out how we can help

Type 1 Fire Risk Assessment: Common parts only (non-destructive)

The most common fire risk assessment type; which is a non-destructive inspection of the communal and managed areas of a residential property.

Although it does not include demised areas it does consider the construction of the property, apartment doors and the separation between apartments. Service risers, roof areas and above false ceilings, where installed, could be accessed during the inspection.

Unless it is suspected that there are serious deficiencies in structural fire protection for example inadequate compartmentalisation, or poor fire stopping – a Type 1 Fire Risk Assessment would normally be sufficient for most buildings and apartment blocks.

Need a Type 1 Assessment? – Contact us to find out how we can help

Who may need to examine my Fire Risk Assessment?

The Health and Safety Executive (HSE) and/or your local Fire and Rescue Service have the right to inspect your FRA. They may also carry out random spot inspections of premises. So if a business, company or organisation haven’t completed a Fire Risk Assessment they will be breaking the law.

How long does an assessment take?

The length of time that it may take to carry out a fire risk assessment can vary greatly as there are many factors to take into consideration. Size of the property, complexity of the building, building usage, access restrictions, construction, type of assessment (see Fire Risk Assessment Types), etc. However, most assessment visits are completed in a day. Writing the report may also take time based on the above factors; however, we do like to have them sent within 10 working days.

I own a building that I lease out and have no direct involvement in the operation of it. Do any fire regulations apply to me?

The current legislation regarding fire safety in workplaces applies to any person who has control over a workplace or building. You need ensure that your tenants are made aware of the legislation and work with them to ensure full compliance.

What is PAS79 and how does it help?

First published in 2005 and revised in 2007, PAS 79 sets out a methodology for undertaking a fire risk assessment. It is a Publicly Available Specification. Although not a British Standard, it has been developed and published by the British Standards Institution, BSI.

Fast R Solutions complete their fire risk assessments based on the templates and process based on PAS79. This allows clients to gain an understanding of what is required by the standard, what we as Assessors are looking for and how information is presented.

When should the Fire Risk Assessment be reviewed?

The original Fire Risk Assessment should be reviewed at regular intervals, at least annually, to ensure it remains “suitable and sufficient” in relation to the property. If there are any material changes to the property then the assessment must be reviewed.

It is also a good idea to have the fire risk assessment reviewed by a competent person should it be deemed not to be “suitable and sufficient” or should a fire or other fire safety incident occur.

What should a Fire Risk Assessment cover?

The FRA should identify and assess:

  • The relevant people at risk (Residents, Staff, Contractors and others)
  • Fire hazards (Waste materials and other sources of fuel, ignition sources such as electrical systems and other sources of heat, flammable gases and liquids)
  • Life safety systems (detection systems, fire suppression systems, extraction systems, etc.)
  • Fire safety management (maintenance regimes, training, etc.)

The assessment must include any significant findings and any recommendations for improvement.

What is the purpose of the Fire Risk Assessment?

To provide an assessment of the risk to life from fire in the premises, and where appropriate, to make recommendations to reduce those risks to life.

A fire risk assessment does not provide protection from a fire, but acting on the recommendations can help reduce the chances of a fire occurring and should a fire occur reduce the impact on relevant persons

Who is the ‘competent person’?

According to The Regulatory Reform (Fire Safety) Order 2005 (RRO) the competent person is someone who has ‘sufficient training and experience or knowledge and other qualities in order to complete the FRA’. These other qualities should include integrity and an ethical approach to their role.

As a minimum, the person should have undergone a fire risk assessment course, appropriate to the assessments they are completing, and belong to a professional body focused on fire safety.

Fast R Solutions are members of the Fire Protection Association and assessors belong to the Institute of Fire Engineers

Who is the ‘responsible person’ or ‘duty holder’?

The responsible person is identified under article 3 of The Regulatory Reform (Fire Safety) Order 2005 (RRO) as:

  • In relation to a workplace, the employer, if the workplace is to any extent under his control;
  • The person who has control of the premises (as occupier or otherwise) in connection with the carrying on by him of a trade, business or other undertaking (for profit or not); or
  • The owner, where the person in control of the premises does not have control in connection with the carrying on by that person of a trade, business or other undertaking.
Why is an Fire Risk Assessment (FRA) required?

The Regulatory Reform (Fire Safety) Order 2005 came in to force in 2006 and did away with the old fire safety certificates issued by the Fire & Rescue Service. This effectively moved the responsibility for proactive fire safety to building owners, managers and occupiers also known as the responsible person.

Under the requirements of the Regulatory Reform (Fire Safety) Order 2005 every property, excluding a single private dwelling, is required to have a “Suitable and Sufficient” FRA completed by a competent person.

Article 9 of the Regulatory Reform (Fire Safety) Order 2005; states:

“The responsible person must make suitable and sufficient assessment of the risks to which relevant persons are exposed”. Furthermore article 9 (6) states “that as soon as reasonably practicable after the assessment or review the responsible person must record the significant findings of the assessment including measures which have or will be taken by the responsible person and details of any person(s) identified by the assessment as being especially at risk.”

Fire Safety Training?

There is a requirement under Article 21 of the Regulatory Reform (Fire Safety) Order to provide Fire Safety Training to employees.

FastR Solutions provide a range of fire safety training courses both in-house and open access including: -

  • Fire Awareness
  • Fire Warden / Fire Marshal
  • Fire Extinguisher &
  • Fire Evacuation Chair

All evacuation chair training is based at your premises If you need an in-house fire safety training course we will tailor the content to suit your company policies and procedures.

Check out our Fire Safety Training page for more details.

Have an existing Fire Risk Assessment?

If you have as suitable and sufficient fire risk assessment already in place there may be no need to have another one done.However, there is a growing trend by professional bodies that want a fire risk assessment dated within the last 12-24 months particularly when selling a property.

But did you know that your fire risk assessment needs to be reviewed on a regular basis to ensure it is still “suitable & sufficient”? This should be done at least annually, when there are changes to the property or if it is thought to be no longer valid.

There are many reasons why your risk assessment should be reviewed from legal and environmental changes to changes of use or users of the building. If you need help to review your risk assessment then contact us, and one of our highly qualified fire risk assessors will be able to help.

Why Choose Us?

FastR Solutions are a Fire Risk Assessment provider who concentrate on providing a Fire Risk Assessment service. We do not actively sell fire safety equipment nor do service fire alarms etc.
So when you engage us to to do your Fire Risk Assessment you can be sure any recommendations are based on what you need, not what we can sell you.

A Fire Risk Assessment should offer you peace of mind, knowing that you have fulfilled your responsibilities and received the right level of service from your fire risk assessor. That is why you need to choose your fire risk assessment company with care.

With our expertise and realistic approach we will furnish you with a “suitable and sufficient” comprehensive fire risk assessment based on the PAS79 standards for life safety; which is easy to understand and free of unnecessary clutter or jargon. So you comply with the requirements of the Regulatory Reform (Fire Safety) Order 2005 whilst being clear and concise.

Although we love working for our clients in the West Midlands, we travel up and down the country daily completing fire risk assessments. Our dedicated Fire Risk Assessors carryout in excess of 300 Fire Risk Assessments per annum in London alone.

Choosing the right Fire Risk Assessor

It is essential to choose the right fire risk assessor as getting it wrong can be costly. FastR Solutions highly qualified and experienced assessors have been providing fire risk assessments since 2005 when the Regulatory Reform (Fire Safety) Order 2005 came into force.

Our expertise and realistic approach will furnish you with a “suitable and sufficient” comprehensive fire risk assessment; which is easy to understand and free of unnecessary clutter or jargon.

Our Fire risk assessments utilise the PAS 79 standard for Life Safety; they are written to help you comply with the requirements of the Regulatory Reform (Fire Safety) Order 2005.

Specialising in the Block Management industry providing Fire Risk Assessments and advice to some of the countries most well know management companies and developers we are the singular best choice for any property manager who wants an expert service from specialists in Fire Risk Assessment.

Our expertise covers but is not restricted to:

  • Residential Blocks
  • Retirement Schemes
  • Converted Houses
  • Mixed Use Schemes
  • Offices
Fire Extinguisher Types
Fire Extinguisher Types & Uses

There are 4 common types of fire extinguishers used in most properties. these are: -

Water

The most common of fire extinguishers it is used on paper, wood, natural fabrics etc; any carboniferous material. Has Red identification strip if not a standard red extinguisher.

Water based fire extinguishers are not safe to use on electrical equipment; some versions may be tested for accidental use on electrical's.

Foam (AFFF)

Increasingly popular being able to use it like water extinguishers and for use on flammable liquid fires. Has a Cream Identification Strip.

Foam based fire extinguishers are not safe to use on electrical equipment; some versions may be tested for accidental use on electrical's.

Co2

Probably the second most common type of fire extinguisher it main use is for electrical fires but can also be used on flammable liquids. Has a Black identification Strip.

Co2 is a gas that removes the oxygen from a fire so should not be used in enclosed spaces. It is also very cold and may cause burns if directed at the skin.

Powder (ABC)

Increasingly common and can be used on all types of fires but often installed incorrectly. Has a Blue identification Strip.

Current British Standards state these should not be placed/used in enclosed spaces; once activated visibility is greatly compromised.

User checks for Extinguishers
User Checks

The responsible person or the person in charge of fire safety for the premises should also be completing weekly inspections. Inspections should include: -

  • Extinguishers are located correctly and have not been moved
  • Extinguisher is accessible and ready for use
  • Gauges, where fitted, indicate the correct pressure
  • Extinguishers are free of damage and have not been abused
  • Extinguishers have not been discharged

Weekly checks should be recorded in the Fire Safety Log Book for the property.

Commissioning & Maintenance
Annual inspection

All fire extinguishers should be commissioned by a qualified technician before installation. Failure to commission a fire extinguisher correctly may result in the appliance not working correctly when most needed

In most cases fire extinguishers will need a basic annual service by a qualified technician. Inspections will include: -

  • Checks for damage or signs of deterioration
  • Weight checks to ensure there is no loss of contents
  • Removal of hoses/horns and replacement of seals
  • physical checks of gauges to ensure they are working correctly

Most extinguishers, except Co2, require an extended service every 5 years.

Co2 Extinguishers will need a 'Stretch Test' every 10 years. This cannot be done without specialist equipment; as sush these are usually replaced

Fire extinguishers need servicing or replacement? We can provide provide you with recommendations of what you need.

Get in touch today to book your service: Call 0800 246 1802
Location of Extinguishers
The location of fire extinguishers is dependant on a number of variables.

However, as a quick guide extinguishers should be located: -

  • in conspicuous positions using brackets, stands or cabinets
  • At room exits, in corridors, stairwell lobbies and landings
  • At the same location on each floor
  • Near to specific fire risks
  • and at fire safety points

Understanding where fire extinguishers should be placed requires a certain amount of expertise. Our fire extinguisher audit service will provide you with recommendations of what you need and where they should be located.

Get in touch today to book your audit: Call 0800 246 1802
How many extinguishers?
The number of fire extinguishers required is dependant on a number of variables.

As a quick guide there should be a minimum of two per floor and these should be within a defined distance of where they may be used.

Section 8 of British Standard BS5306-8 Fire Extinguishing Installations and Equipment on Premises details the minimum number of class A fire extinguishers as –

  • Floors of less than 400 Sqm: at least two extinguishers with a class A rating with a combined total of 26A per floor
  • Floors of more than 400 Sqm: at least two fire extinguisher with a class A rating. Giving a total combined fire rating of 0.065 x total Sqm of floor area.

A 500 Sqm floor will work out as 0.065 x 500 =an A rating of 32.5 meaning a three fire extinguishers may be required based on an extinguisher having a 13A rating.

Understanding what fire extinguishers you need requires a certain amount of expertise. Our fire extinguisher audit service will provide you with recommendations of what you need and where they should be located.

Get in touch today to book your audit: Call 0800 246 1802

Want to know more or Utilise our Risk Assessment Service?

Then give us a call on 01386 555 739 or Freephone 0800 246 1802

You can also email us at contact@fastrsolutions.uk

Register for one of our training courses

The provision of safety training to staff is one of the most cost effective ways of reducing incidents at work.

Read More

Speak to our friendly team

We are always happy to answer any queries you may have about our Fire Risk Assessment or Health & Safety services